Our Project Life Cycle: An End-to-End Solution from Survey to Maintenance

At the BM Makina Group, we begin every project with a survey and needs analysis, then assess the risks and prepare a feasibility study, quotation and project plan. Mechanical/electrical design and engineering calculations are carried out; where necessary, prototyping/validation steps are applied. During production, chain hoist systems, conductor rail/power transmission solutions, cable reels and rail-system maintenance equipment (e.g. mobile lifting jacks, support stands, welding positioners) are manufactured in our factory. Every sub-component passes pre-assembly quality control and function tests.

On site, installation, cabling, parameter settings and commissioning are carried out. On delivery, user training, operation and maintenance documentation and spare-parts lists are provided. After delivery, we support operation throughout the system’s life cycle with service, maintenance, remote support and on-site intervention. At every stage, we aim for uninterrupted, efficient and long-life operation with the principles of occupational safety, traceability and continuous improvement.

30

+
Countries Served

1500

+
Completed Projects
BM Makina DOF Robotics Production Line Ergonomics Project
DOF Robotics Production Line Ergonomic Crane System Project

5 January 2026

DOF Robotics Production Line Ergonomic Crane System Project

ADY (Azerbaijan Railways) – DEMYKS Systems
DEMYKS Systems for ADY (Azerbaijan Railways)

12 February 2022

DEMYKS Systems for ADY (Azerbaijan Railways)

BM Makina DEMYKS Lifting Systems
Metro Istanbul M5 Line Train Lifting Systems

17 March 2019

Metro Istanbul M5 Line Train Lifting Systems

BSH Çerkezköy Factory CPS Contactless Power Supply System
BSH Çerkezköy Factory – CPS Contactless Power Transmission System

5 January 2019

BSH Çerkezköy Factory – CPS Contactless Power Transmission System

BM Makina Vahle Asyaport Container Port eRTG Power Transmission Systems Project
Asyaport Port eRTG Project

7 July 2015

Asyaport Port eRTG Project

BM Makina Vahle Kumport Port eRTG Conversion Project
Kumport Port eRTG Conversion Project

12 January 2014

Kumport Port eRTG Conversion Project

BM Makina DEMYKS Istanbul Olimpiyatköy metro depot project – lifting and maintenance equipment in the metro car maintenance workshop
Olimpiyatköy Metro Depot Train Lifting Systems

22 November 2012

Olimpiyatköy Metro Depot Train Lifting Systems

BM Makina Vahle Borusan Gemlik Port eRTG Electrification Project
Borusan Gemlik Port eRTG Electrification Project

12 July 2011

Borusan Gemlik Port eRTG Electrification Project

BM Makina Diesel-to-Electric RTG Conversion Project at Mardaş Port
Mardaş Port eRTG Conversion

6 November 2010

Mardaş Port eRTG Conversion

BM Makina Vahle for the Historic Beyoğlu Tunnel Power Transmission System Project Header
Power Transmission System for the Historic Beyoğlu Tunnel

2 March 2005

Power Transmission System for the Historic Beyoğlu Tunnel